A delivery of new laptops, monitors, kettles or power tools lands on site, and someone must decide whether staff can plug it in that morning or whether it waits for testing. Across a multi-site estate, that question repeats every time a pallet arrives. Hold the kit back when there is no need and you slow work down. Wave it through without a glance and you have assumed an item is safe when nobody has actually looked.
Does Brand New Equipment Need PAT Testing?
Not before first use, as long as it is properly marked. New electrical equipment should reach you in a safe condition and carry the appropriate safety marking, so there is no legal requirement to PAT test it before it goes into use. The marking matters more than the test here. A new item should carry UKCA or CE conformity marking, and a BS Kitemark where one applies. If it does not carry the appropriate marking, it should not be put into service at all. A visual check on arrival, confirming the marking is present and the plug and cable are sound, should come first.
Plenty of businesses still have new equipment tested as it comes in, and we attend sites across the UK to test new equipment as it is delivered or brought into service. There is no single law that says every appliance must be PAT tested. The Electricity at Work Regulations 1989 require employers to keep electrical equipment safe, and testing is how most businesses show they are meeting that duty over time. If you are not sure which of your items fall into a testing programme at all, our guide to what needs PAT testing across UK workplaces sets it out.
When New Equipment Should Be Tested Before Use
The law does not require a PAT test on new equipment before first use, and the HSE’s guidance on portable appliance testing reflects that. Even so, there are clear situations where having a new item tested as it arrives is worth it, and we attend sites regularly to do exactly that:
- Equipment going straight into service. Where new kit is being commissioned or put to work immediately, testing on delivery gives you a documented safety check and a clean record from day one.
- Visible damage in transit. If packaging is crushed or an item looks knocked about, have it tested before it goes into service rather than assume it survived the journey.
- 110V tools on construction sites. Conditions on site are harsh, and many principal contractors require every tool, new ones included, to be tested and logged before it goes to work.
- Insurer requirements. Some policies ask for every appliance on the premises to be tested, new items included, so it is worth checking your policy wording.
- Bulk or online orders where counterfeits are a risk. Fake electrical goods do turn up in large or online purchases, and our engineers have failed brand new items that were wired incorrectly or turned out to be counterfeit.
One thing testing does not do is rescue an unmarked item. If a new product does not carry the appropriate safety marking, UKCA or CE conformity marking and a BS Kitemark where one applies, it should not be put into service at all. Testing is not a way to sign off equipment that should not be in use in the first place. The same applies to anything our engineers fail: a counterfeit or incorrectly wired item is removed from service, not patched up and passed.
The Visual Check Your Team Can Do on Day One
You do not need an engineer for the first check on a new appliance. A short user inspection covers the marking, the plug, the cable, and the casing. First, confirm that the item carries the appropriate safety marking. If it does not, it should not go into service; whatever else looks right. Then check the plug is fitted correctly, the pins are straight and the cable is gripped firmly where it enters. On the cable, look for cuts, kinks, or exposed wires. On the casing, look for cracks or anything lose inside.
If the marking is present and all of that looks right, the item is generally fine to use. Where a formal check begins is the inside of the appliance and its safety under test: earth continuity, insulation resistance and the readings only calibrated equipment can confirm. What that electrical test involves depends partly on the appliance’s class, 1, 2 or 3. A day-one visual check tells you an item looks safe. A full inspection by our engineers confirms it is. For new equipment, the two work together: your team handles the quick look, and anything doubtful waits for us.
Adding New Equipment to Your Testing Schedule
Once a new item is in use, the practical question is how it stays tracked. When it is first tested, it goes on your asset register with its own record, and from then on it is picked up in your normal PAT testing cycle alongside everything else. Fixed equipment that is wired in rather than plugged in sits under fixed wire testing (EICR) instead, on its own cycle.
For a single office, that is simple enough. Across a national estate, where kit is bought centrally and shipped out, it matters more. New appliances can arrive at dozens of locations between visits, and without a clear process they slip off the register and out of the cycle. We build that in: new items are logged, added to the right site register and tested on the next scheduled visit, so your records stay accurate everywhere.
Keep New Equipment Covered from Day One
New equipment does not need to be a separate job or a source of doubt. The quick checks keep your team moving on the day, and a planned programme makes sure every new item is tested and recorded, whether that is on delivery, as it is commissioned, or at the next scheduled visit, whether a handful of laptops in one office or tools and appliances landing across hospitality venues in London and sites nationwide.
Tell us about your sites and how equipment comes in, and we will fold new items into your testing programme and keep the records straight. Request a quote or call 01845 524498.