A Compliance Guide to Emergency Lighting Testing

Emergency lighting is one of those building systems that has to work the first time, every time. It sits on standby for months at a stretch, and you only find out whether it works during a power cut or an evacuation. The duty to maintain it sits under the Regulatory Reform (Fire Safety) Order 2005, and BS 5266-1 sets out how that […]
EICR for Offices Frequency

For most commercial offices, the EICR (also known as fixed wire testing) is one of the longer-cycle items on the compliance calendar. Years can pass between inspections, so the certificate often sits in a folder rather than at the front of mind. The standard frequency for offices is every five years, and the engineer can recommend […]
PAT Testing for Hotels: What the Process Actually Looks Like

PAT testing for a hotel means working through every plugged-in appliance on the property, one at a time. The engineer covers the kitchens, guest rooms, back-of-house, and public areas, running a visual inspection, the electrical tests, and a function check on each appliance, then labelling those that pass and removing any that fail. The visit can be […]
How Often Does A Fire Risk Assessment Need Reviewing?

When you have a fire risk assessment in place, it’s just as important to keep it up to date as it was to carry one out in the first place. As a general rule, the review period is once a year, with a new review needed whenever something significant changes that could affect fire safety. Higher-risk environments may need it […]
Does Your Building Need A Thermographic Survey This Year?

Hospitals don’t switch off. Nor do 24/7 logistics sites, factories with always-on distribution boards, or hotels through occupancy. For buildings like these, a thermographic survey is the only way to check the electrical installation while it stays live, picking up faults that a standard EICR cannot catch under switched-off conditions. There’s no recommended interval for it in UK guidance. The decision to book […]
What Does a Commercial EICR Actually Cover?

The quickest way to clear up what a commercial EICR actually covers is to draw one line. An EICR tests the building, not the things you plug into it. Everything hardwired through your electricity meter, including distribution boards, circuits, sockets, switches, and light fittings, sits inside the inspection. The kettle, the laptop, the paper shredder sit outside it. Once that’s clear, the rest falls […]
EICR For Offices: How Frequent Does It Need To Be?

How often does an office need an EICR? It depends on the building. The condition of your electrical installation, how the office is used, and how old the wiring is all play a part. For most offices, we recommend an EICR every five years. Older installations or buildings under heavier load can need testing sooner, […]
PAT Testing for Warehouses: What to Expect on the Day

PAT testing for a warehouse is a straightforward day when you know what to expect. An engineer works through every mains-powered appliance on site, runs a visual check and electrical tests, labels what passes, removes what fails, and leaves you with a full report. The trick is planning the visit around operations so nothing grinds to a halt. […]
Fire Risk Assessments for Universities: Are You Up to Date?

If you manage a university campus, keeping fire risk assessments current across every building is one of the more involved jobs on the compliance calendar. Each building has different uses, different risk profiles, and different access requirements, so an assessment that was accurate twelve months ago may not reflect how the space is actually being used […]
How Often Does Commercial PAT Testing Actually Need to Be Done?

Commercial PAT testing comes with a lot of conflicting advice. A quick search online throws up technical jargon, risk matrices, and opinions that don’t always agree with each other. For most UK businesses, though, it’s more straightforward than it looks. Some workplaces overcomplicate their testing schedule and end up with unnecessary admin. Others lose track of when equipment was […]